Contacts for Construction Phase

Useful Links & Contacts

Here are some companies and individuals who have helped us.

 

Renewables First provided project design, contract supervision and project management throughout this project. Their role was both supportive and inspirational.

www.renewablesfirst.co.uk

CT Construction were the principal civil engineering contractors. They were thorough and efficient.

www.ct-construction.co.uk/

Ecowave designed and built the turbine and the control panel. The requirement to maintain the flow of compensation water requires a sophisticated system.

http://ecowavesystems.co.uk/

Key Fund provided a valuable bridging loan during the construction period.

thekeyfund.co.uk/

 

 

The community share offer was coordinated by PR and fundraising specialist Clare Walker of C J Communications and attracted shareholders from all over the UK. For further information contact: claremwalker@hotmail.co.uk or  phone 07595 873221.

Architect for the turbine house:  Tony Dust designed a building that blends in with the local area and was acceptable within the Green Belt.   P A Dust1 Spring Mil, Spring St, Uppermill, Oldham,  OL3 6AJ  Tel: 01457 870 382 tony.dust@btinternet.com